This stage describes the activities associated with, handover of the built asset including updating ‘as constructed’ information, commissioning, and training. All information necessary for Soft Landings activities should be completed and the employer briefed and or trained in their operational requirements as per the contract.
During this stage the structured information prescribed in the Employers Information Requirements (EIR) and created during the evolution of the Project Information Model (PIM) shall be transmitted to the Asset Information Model (AIM) in the required formats such as COBie and proprietary geometric models.
It is important that the “as-constructed” models be verified for completeness including laser scan surveys and point-cloud analysis.
The data requirements of the handover process and associated activities are documented in PAS1192-3.