Model Status

Construction Model

5.JPGWhat the model can be relied upon for

An accurate model of the asset before and during construction incorporating co-ordinated specialist subcontract design models and associated model attributes. The model can be used for sequencing of installation and capture of as installed information.

Output

Integrated production Information. Complete fabrication and manufacturing details, system and element verification, operation and maintenance information Modify to represent as installed model with all associated data references

Parametric information

Production record for the project: Specific systems, objects and assemblies accurate in terms of specification, size, form, function and location with detailing, fabrication, assembly, and installation information Detailed routing of systems Fixings and interfaces details to be used Updated: energy use and embodied and in use carbon, detailed design and construction programme

Project costs

Contract Sum/ Target Price/ Agreed Maximum Price Pre-construction whole life cost plan